Biodiversity Net Gain

Biodiversity Net Gain consultants in Manchester and across the UK

Most new developments in England now have to deliver at least a 10% gain in biodiversity, measured using the statutory biodiversity metric. We help you work out what your site needs, design a way to deliver it, and produce the documents the planning authority will ask for.

We work with developers, architects, schools, councils and landowners across most of the UK from our base in Manchester, from small residential sites to larger schemes. That includes sites right across Greater Manchester, where we can usually get to you at short notice.

35807680251 bd528fb154 k 1024x1024

How we can help

Baseline habitat survey

We survey the site and record each habitat and its condition using the UK Habitat Classification. This gives the starting value of your site in biodiversity units.

Metric calculations

We run the statutory biodiversity metric for your existing site and your proposed landscaping, so you can see early on whether your scheme reaches the 10% gain and where it falls short.

Design advice

We work with your architect or landscape designer to find the best way to reach the gain on site, for example by choosing habitats and planting that score well and suit the site.

Biodiversity Gain Plans

We prepare the Biodiversity Gain Plan for your planning application or for discharging the biodiversity gain condition.

Habitat Management and Monitoring Plans (HMMPs)

Where habitats need to be created or improved, the planning authority will usually ask for an HMMP. It sets out how the habitats will be created, managed and monitored for at least 30 years, and who is responsible. We write HMMPs and can carry out the monitoring surveys and reports that follow.

Frequently asked questions

Most major developments have needed it since February 2024, and most small sites since April 2024. Some developments are exempt, including householder applications and developments that affect less than 25 square metres of habitat. From 6 August 2026, sites of 0.2 hectares or less (measured within the red line boundary) are also exempt, as long as they don’t affect a priority habitat on the site. Send us your plans and we’ll tell you whether BNG applies.

You can make up the difference with off-site habitat, for example by buying units from a habitat bank. Statutory credits are a last resort. We’ll talk you through the options.

As early as possible, ideally before the site layout is fixed. It’s much easier and cheaper to design the gain in than to find it later. The habitat survey is often done alongside a Preliminary Ecological Appraisal.

Get a quote

Send us the site address and your site plans, and we’ll come back to you with a quote for the BNG work you need.

Two ecologists electric fishing a shallow stream during a fish rescue

Safely capture and relocate fish before work to protect aquatic life and habitats.

Small bat resting on a gloved hand during a bat survey

Protected Species Surveys

Find out whether protected wildlife uses your site before works start.

screenshot 2023 10 11 185208

Preliminary Ecological Appraisal

PEAs rapidly assess a site’s habitats and species to flag ecological issues early.

giant hogweed

Invasive Species Surveys

ID non‑native plants to guide land management & protect biodiversity.

river

River Condition Assessments

Assess river habitat to understand condition and guide restoration.

ariel tree inspection

Aerial Tree Inspections

Expert aerial tree inspections to assess bat roost potential.